Line History crashes VS 2005

If you are having a problem using Vault, post a message here.

Moderator: SourceGear

Post Reply
neal007
Posts: 225
Joined: Tue Feb 17, 2004 10:13 am

Line History crashes VS 2005

Post by neal007 » Thu Jun 07, 2007 2:06 pm

I would have never known about "Line History" until Jeremy told me of it, it could probably be named better such as "Get Line History from Vault" as people won't know what it relates to.

Anyways, I just tried it, I highlighted a line of code, right-clicked and picked "Line History" and VS 2005 crashed.

jeremy_sg
Posts: 1821
Joined: Thu Dec 18, 2003 11:39 am
Location: Sourcegear
Contact:

Post by jeremy_sg » Thu Jun 07, 2007 2:44 pm

Sorry. Crashing VS is inexcusable.
Can you give me more information about what you were doing? Was the file edited locally? What type of file was it? Was it checked in, or freshly added?

A log file of the crash after enabling Vault client logging would be helpful as well.

neal007
Posts: 225
Joined: Tue Feb 17, 2004 10:13 am

Post by neal007 » Thu Jun 07, 2007 2:53 pm

This is becoming a mess fast!

I reopened the solution to retry for you, but if I recall correctly the file was checked in, I highlighted a line of code, right-clicked, selected Line History.

Now that I reopened a solution, I get a ton of errors (I'll try to attach) then my solution is NOT bound to SCC! I go to Tools...Options and it shows VS 2003 again.

<refraining from further comment - VS 2005 integration is NOT ready>
Attachments
Error Opening Solution.jpg
Error Opening Solution.jpg (24.26 KiB) Viewed 3066 times
Another Error.jpg
Another Error.jpg (32.28 KiB) Viewed 3066 times

neal007
Posts: 225
Joined: Tue Feb 17, 2004 10:13 am

Post by neal007 » Thu Jun 07, 2007 2:55 pm

When I close VS.NET 2005 after these errors are completed, it crashes.

No time to deal with logging, sorry!

neal007
Posts: 225
Joined: Tue Feb 17, 2004 10:13 am

Create a NEW SOLUTION

Post by neal007 » Thu Jun 07, 2007 3:03 pm

I create a new EMPTY solution thinking I'll just add my projects to a fresh solution file. So I create the new solution file, add to vault, don't see any SCC flags on the SLN node (no projects added yet). I go to check it in and for some reason some remnant of another project is also in the list to be checked in, hmm, okay, whatever, checkin!

Solution reloads, still no SCC flag on the SLN top node. Checkout, check-in, ERROR! See attached image.

Also, when I start VS.NET 2005 I go into Tools...Options...Source Control and it shows VS 2003 again. Why won't it stay with VS 2005 as the default???? You think we are going to remember to change this prior to ever creating a new solution/project?
Attachments
Error.jpg
Error.jpg (21.04 KiB) Viewed 3057 times

neal007
Posts: 225
Joined: Tue Feb 17, 2004 10:13 am

Post by neal007 » Thu Jun 07, 2007 3:13 pm

Fortunately I zipped everything up prior to switching, I have regressed back to VS 2003 integration (regressed? hmm, not sure that's the right word). I have work to do, I don't have time to beta test, game over for me, back to work!

Post Reply