Hi
We have the option checked in VS2005 to get latest when a solution is opened. The project is bound to Vault and we can do a get latest (manually) without any errors.
The problem is that a the initial get latest when the solution opens doesn't actually get the latest. It says it's doing a get latest but it doesn't.
When the solution has opened and you right-click on the solution and select get latest recursive then is does a get latest (sometimes).
I've had situations where I've had to check the file out to get latest properly.
In out Vault settings we have the modified working copy set to overwrite and prompt before overwriting checked.
Any suggestions would be appreciated.
Thanks
Peter
Get Latest VS2005 and Vault server 3.19 and client 3.19
Moderator: SourceGear