Changeset item paths need updating

If you are having a problem using Vault, post a message here.
Post Reply
BigBrett
Posts: 218
Joined: Wed Feb 01, 2006 8:45 am

Changeset item paths need updating

Post by BigBrett » Thu May 31, 2012 2:04 am

We changed part of the repository path for two of our projects after having done checkins against item tracking. When we want to check the file changes for those changesets they still list the old repository path so we cannot see what changes were made.

The old path would be, for example, $/CivilDesigner.root/CivilDesigner2011_VS2008/etc whereas the new path is $/CivilDesigner.root/CivilDesigner2011/etc.

What is the easiest way, if it is actually possible, to change the repository path that those changeset items report ? We have about 7000 of these changes so an automated method would be good.

Regards,
Brett

lbauer
Posts: 9736
Joined: Tue Dec 16, 2003 1:25 pm
Location: SourceGear

Re: Changeset item paths need updating

Post by lbauer » Thu May 31, 2012 8:11 am

If I understand this properly, you've updated work items with a checkin, but now the path to the work item in the work item comments is no longer valid. Is that correct?

We may be able to change the path with a SQL query. Email support at sourcegear.com, Attn: Linda. Please include a link to this forum post.
Linda Bauer
SourceGear
Technical Support Manager

Post Reply