Anyhow My issue is that I can't get shelve to work.
I have been working with vault since 3.x and using the Classic client. We code in both Delphi and VS.NET and the Delphi code is checked in with the vault client once edited. In Visual Studio we do not allow VS.NET to check in the solution just the projects.
We find that VS requirement when working with source code control draconian.
1. As far as I can tell the user MUST have the solution in a folder that is the same name of the solution.
2. All projects MUST be in a child folder in the solution
3. If you add a project to a checked in solution it is automatically placed into the sub folder of the solution and checked in.
(If the above is untrue please inform me.)
So far I think I have figured I need the Enhanced client but none of my projects load even if I delete the director and reload them from the source code control. I get it Microsoft figured who would switch source code control software from there product. LOL
Thus a little help here would be appreciated.
Finally, if you have the time can you share how you work with Visual Studio and source code control? Are you a good Nazi and follow the rules required by Microsoft?

Thanks
Davinci