
When checking in provide the ability to:
(1) assign a status instead of just marking the item as completed. A dropdown list of the status codes you use for the project would be ideal.
(2) along with being able to assign a specific status give us the ability to assign the item to another user, again using a dropdown list of users assigned to that project.
Thanks for considering it!