Bug:Project Admin

If you are having a problem using Dragnet, post a message here.

Moderator: SourceGear

Locked
ctech
Posts: 2
Joined: Thu Dec 02, 2004 10:33 am
Location: Greece

Bug:Project Admin

Post by ctech » Tue Dec 07, 2004 1:29 pm

A small problem with dates (localized).
1. Open an existing item
2. Press submit (with no changes).
3. Date format error appears.
4. Change date (even select same date).
5. Press submit.
6. It works!

Thanks
Alex
Attachments
Clip.gif
Clip.gif (130.59 KiB) Viewed 5717 times

mskrobul
Posts: 490
Joined: Wed Jan 14, 2004 10:22 am
Location: SourceGear
Contact:

Post by mskrobul » Tue Dec 07, 2004 3:31 pm

If the calendar is visible we go by the date selected on the calendar, which gets localized correctly (which is why you are seeing the behavior you are seeing).

It the calendar is not visible, we try to parse the date from what is typed in the text field. There seems to be a bug in the date parser for non-english dates.

I have logged this as a bug. Thanks for the report!
Mary Jo Skrobul
SourceGear

Locked