After Commit All in Visual Studio with enchanced client Pending Change
Set in Stand-alone Client is not updated. Rescan does not help.
Is there any way to synchronize Pending Change Sets in stand-alone
client and in plug-in?
Thanks
Client 4.1.1
Server 4.1.1
After Commit All in VS Change Set n Client is not updated
Moderator: SourceGear
-
- Posts: 4
- Joined: Fri Apr 11, 2008 12:41 am
-
- Posts: 4
- Joined: Fri Apr 11, 2008 12:41 am
-
- Posts: 4
- Joined: Fri Apr 11, 2008 12:41 am
My guess is that baseline files were moved or deleted, or your working copy was moved/renamed on disk in such a way that it's no longer being correctly associated with the appropriate baselines. I'd do this:
1) Close any other clients, e.g. Visual Studio.
2) In the stand-alone client, empty the pending changes. (Check things in, ensure there are no changes you care about and undo them, etc.)
3) Do a get latest with "Do Not Merge/Merge Later" selected to make sure there are valid baselines for everything.
1) Close any other clients, e.g. Visual Studio.
2) In the stand-alone client, empty the pending changes. (Check things in, ensure there are no changes you care about and undo them, etc.)
3) Do a get latest with "Do Not Merge/Merge Later" selected to make sure there are valid baselines for everything.
Ian Olsen
SourceGear
SourceGear