We use VSS 6 and SOS 3.5.2.
In VSS I use to proceed as follows when making releases:
1. Label a baseline project
2. Show history of the project
3. Share the baseline project with a release project.
The result is that the labelled version of all files in the baseline project are pinned in the release project. This is exactly what I want. The released files can not be changed in the Release project but are still changeable in the baseline project.
In SOS the Share option is missing in the View History dialog. Any suggestions on how to reach the same result?
Sharing labelled projects from Show history dialog
Moderator: SourceGear